{"is":"issue","title":"Planned HPCC datacentre power outage","body":"\u003ch4 id=\"hpcc-planned-power-outage-update\"\u003eHPCC planned power outage update\u003c/h4\u003e\n\u003cp\u003eThe outage started on Feb 23 is over. Grex is operational. Some of\nthe GPU compute nodes may still be unavailable, and will be in production shortly.\u003c/p\u003e\n\u003ch4 id=\"hpcc-planned-power-outage\"\u003eHPCC planned power outage\u003c/h4\u003e\n\u003cp\u003ePhysical Plant had informed us that it plans to shut down power feed for transformer work, to several buildings including HPCC where Grex is located.\nFor this reason, we  have a complete Grex outage starting from 7 AM, Feb 23, 2025. The planned end of the outage is by the end of the day on Monday, Feb 24.\nThe system is completely be unavailable to the users. Login nodes and data are not be accessible during the outage.\u003c/p\u003e\n","createdAt":"2025-02-23 07:00:00 +0000 UTC","lastMod":"2025-02-23 07:00:00 +0000 UTC","permalink":"https://um-grex.github.io/status/issues/2025-02-23-hpcc-poweroutage/","severity":"down","resolved":true,"informational":false,"resolvedAt":"2025-02-24 17:10:00","affected":["Compute nodes","Login nodes","Network","NFS /home","Lustre /project","OpenOnDemand portal","ComputeCanada CVMFS"],"filename":"2025-02-23-hpcc-poweroutage.md"}